Scheel Drive Reconstruction


B.R. Fulton Construction – $1,104,453.80
B.E.I – $1,255,071.68
Thomas Cavanagh – $1,548,900.44
RGT Clouthier – $1,316,742.67
Goldie Mohr – $1,285,827.00
Miller Construction – $1,342,064.61
Awarded to B.R. Fulton Construction.

PW-2017-01 – Scheel Drive Reconstruction
Township of McNab/Braeside
Closing: Tuesday, May 30, 2017 at 1:00 p.m. local time

Sealed tenders, plainly marked as to the contents, will be received by Ms. Lindsey Parkes, CAO/Clerk, Township of McNab/Braeside, Ontario, until 1:00 P.M., LOCAL TIME, TUESDAY, MAY 30, 2017

The Township of McNab/Braeside is reconstructing approximately 2.6 km of Scheel Drive from McLean Drive to 1.0 km south of Carmichael Side Road. The work will include in-place processing of the existing surface, areas of full depth excavation and vertical alignment correction, lane and shoulder widening, supply/placement of granular material, and asphalt paving. Work will also consist of drainage improvements together with ditch realignment and replacement of driveway and road crossing culverts, including the Dochart Creek culvert, with disturbed areas to be treated with topsoil and seed.

Complete tender documents may be obtained from the Township of McNab/Braeside Office at 2508 Russett Drive, Arnprior, Ontario, after 8:30 am on May 17, 2017, upon payment of a non-refundable cost of $100.00 per set. Cheques should be made payable to the Corporation of the Township of McNab/Braeside.

The lowest of any tender may not necessarily be accepted by the Township of McNab/Braeside.

Contacts:
Alex Siciliano, P.Eng., Project Manager
McIntosh Perry Consulting Engineers
115 Walgreen Road
RR#3 Carp, ON, K0A 1L0
Phone: 613-836-2184 x 2245
Fax: (613) 836-3742
[email protected]

Ryan Frew, P. Eng., Director of Public Works
Township of McNab/Braeside
2508 Russett Drive, RR#2
Arnprior, ON, K7S 3G8
Phone: 613-623-5756 x 227
Fax: 613-623-9138
[email protected]