PW-2019-01 Scheel Drive Reconstruction


Closing: March 12, 2019 at 1:00pm

The Township of McNab/Braeside is reconstructing approximately 1.5 km of Scheel Drive from Brae Lock Road to McLean Drive. The work will include in-place processing of the existing surface, areas of full depth excavation and vertical alignment correction, lane and shoulder widening, supply/placement of granular material, and asphalt paving. Work will also consist of drainage improvements together with ditch realignment and replacement of driveway and road crossing culverts, with disturbed areas to be treated with topsoil and seed.

Complete tender documents may be obtained from the Township of McNab/Braeside Office at 2508 Russett Drive, Arnprior, Ontario, after 8:30 am on February 19, 2019, upon payment of a non-refundable cost of $100.00 per set. Cheques should be made payable to the Corporation of the Township of McNab/Braeside.

The lowest of any tender may not necessarily be accepted by the Township of McNab/Braeside.

Contact:
Alex Siciliano, P.Eng., Project Manager
McIntosh Perry Consulting Engineers Ltd.
Telephone: (613) 836-2184 x 2245
[email protected]

Ryan Frew, P. Eng., Director of Public Works
Township of McNab/Braeside
Telephone: (613) 623-5756 x 227
[email protected]