PW-10-2021 Construction of Kramer Avenue Watermain Loop


Closing: June 1, 2021 at 10:00am

Municipality: Petawawa

RGT Clouthier – $266,693.05
Do All Construction – $276,655.00
JWK Contracting – $356,843.96
Williams Sons – $563,050.00

The works include watermain installation by open cut, watermain installation by directional drilling in order to preserve a mature pine tree forest, paving and grading, restoration of schoolyard features, pavement markings and chain link fencing.

Complete tender documents may be obtained digitally from Jp2g Consultants Inc., by emailing their office as noted below, after 8:30 a.m. on Monday, May 10, 2021. An email will be returned with the link and password where the documents, drawings and any future addenda may be retrieved.

Email for tender document registration: [email protected] with the subject line “Tender Request – Kramer Avenue Watermain Loop”.

The successful bidder will be required to file with the owner the specified bonds and insurance within 10 days of being awarded the contract. The lowest or any tender will not necessarily be accepted.

Contact:
Steven Webster, P. Eng. 
Jp2g Consultants Inc.
Phone: 613-735-2507