Achray Road Reconstruction – Phase 2


H&H Construction – $734,392.21
RGT Clouthier Construction – $704,818.35
Do-All Construction – $828,198.58
BEI Excavating – $893,087.51
Smiths Construction – $860,119.50
Greenwood Paving – $806,319.32
Awarded to RGT Clouthier.

PW-01-2017 – Achray Road Reconstruction – Phase 2
Town of Petawawa & Township of Laurentian Valley
Closing: Tuesday, February 21, 2017 at 10:00 1.m. local time

Sealed tenders, plainly marked as to contents, will be received by David Unrau, Director of Public Works, Town of Petawawa, 1111 Victoria Street Petawawa, Ontario, until 10:00 AM, local time, Tuesday, February 21, 2017, for for the reconstruction of Achray Road from 0.3 km west of Biesenthal Road / Biggs Road easterly 1.2 km including pulverizing existing asphalt, granular padding, hot mix paving, tack coat, paved shoulders, culvert placement and ditching.

Complete tender documents may be obtained from Jp2g Consultants Inc., 12 International Drive, Pembroke, Ontario, K8A 6W5, on or after Tuesday February 7th on payment of a non-refundable cost of $100.00 per set. Cheques should be made payable to Jp2g Consultants Inc.

The successful bidder will be required to file with the Town of Petawawa & the Township of Laurentian Valley the specified bonds and insurance within ten (10) days of being awarded the Contract.

The lowest or any tender may not necessarily be accepted by the Corporations.

Contact:
Mr. S. Webster, P. Eng
Vice President
Jp2g Consultants Inc.
12 International Drive
Pembroke, ON K8A 6W5
Phone: 613-735-2507

Mr. David Unrau, P.Eng.
Director of Public Works
Corporation of the Town of Petawawa
1111 Victoria Street
Petawawa, ON K8H 2E6
Phone: 613-687-5536
[email protected]

Mr. M. Behm, C. Tech.
Public Works Manager
Township of Laurentian Valley
460 Witt Road
Pembroke, ON  K8A 6W5
Phone: 613-735-6291
[email protected]