Closing: January 13, 2021 at 2:00pm
Organization: Deep River and District Hospital
The scope of work for this project includes:
- New electrical service consisting of primary overhead line from HONI demarcation point, underground primary to pad mount transformer, transformer vault, pad, grounding and secondary duct bank and feeders into building.
- New main switchboard and all utility metering requirements.
- New distribution within the building including all new feeders as identified on the drawings.
- Emergency power modifications and provisions as detailed on the drawings.
- All other details and requirements included in the specifications and drawings.