Rehabilitation of Municipal Structures – 7 Culverts


Closing: April 6, 2018 at 1:30pm

The Municipality of Mississippi Mills has issued a tender for the  Rehabilitation of Municipal Structures – 7 Culverts, Contract No. 17-178.

Sealed tenders on forms supplied by the Corporation of the Municipality of Mississippi Mills will be received at the offices of the Corporation of the Municipality of Mississippi Mills, CAO, at 3131 Old Perth Road, P.O. Box 400, Almonte, Ontario K0A 1A0 no later than 1:30 p.m. local time, Friday, April 6, 2018, for the Rehabilitation of Municipal Structures – 7 Culverts.  Tenders will be opened in public at the municipality’s offices immediately following closing time on Friday, April 6, 2018.

The general scope of work for the rehabilitation of the 7 concrete culverts includes, but is not necessarily limited to, partial depth concrete removals and repairs (type A, B, C) walls and soffit of culverts and adjacent retaining walls, polyurethane injection of cracks, installation of barrier curbs at Maude Street, Martin Street and Ottawa Street Culverts, installation of guiderail, extension of the gabion basket retaining wall at Strathburn St Culvert, removal and reconstruction of the stone retaining wall at Martin Street Culvert, and construction of new concrete block retaining wall at Camelon Street Culvert. Rehabilitation work at this location may only commence after August 31, 2018 and must be completed by September 28, 2018; contractors shall bid accordingly.

Complete tender documents (electronic PDF version, free of charge) will be available on Monday, March 12, 2018 from HP Engineering Inc., 2039 Robertson Road, Suite 400, Ottawa, Ontario, K2H 8R2 and will be sent via email upon request.  Hard copies of the documents will also be available upon request and on payment of a non-refundable cost of $60.00 per set.  Cheques should be made payable to HP Engineering Inc.

A certified cheque, bank draft or bid bond not less than the amount specified in the tender requirements must accompany each tender and the successful bidder will be required to provide a 100% performance bond and 50% materials and labour payment bond upon execution of the contract agreement.

The lowest or any tender will not necessarily be accepted.  For further information, the Project Manager can be contacted as follows:

Contact:
Mr. Matt Poulin
HP Engineering Inc.
400-2039 Robertson Road
Ottawa, Ontario K2H 8R2
Phone:  613-695-3737
Fax: 613-680-3636