Closing: March 6, 2020 at 9:00am
RGT Clouthier – $109,553.50
Smiths Const. – $121,927.00
Fulton Const. – $144,357.50
H&H Const. – $156,239.45
The Township of Greater Madawaska has issued tender PW 08-2020Granular M Material – Limestone Source.
Location:
- Airds Lake Road 500 tonne
- Brougham Yard 500 tonne
- Brydges Road 500 tonne
- Calabogie Yard 500 tonne
- Fraser Road 1,000 tonne
- Frontenac Road 500 tonne
- Matawatchan Sand Shed 500 tonne
- Murphy Road 1,000 tonne
- Stones Lake Road 500 tonne
- Tatty Hill 500 tonne
- Upper Spruce Hedge Road 500 tonne
Contact:
Jamie Doering, Public Works Manager
Phone: 613-752-2222 ext.2019
[email protected]