PW 07-2020 Granular M Material – Limestone


Closing: March 6, 2020 at 9:00am

Smiths Const. – $138,441.95
H&H Const. – $140,821.73
RGT Clouthier – $152,007.60
Karson – $175,489.00

The Township of Greater Madawaska has issued tender PW 07-2020 Granular M Material – Limestone Source.

Locations:

  • Eastern Avenue (Griffith) 600 tonne
  • Main Street (Griffith) 300 tonne
  • Pheasant Run 2,300 tonne
  • Pucker Street 900 tonne
  • Spindle Drift 750 tonne
  • St. Joseph Boulevard (Griffith) 300 tonne
  • Ginza Street (Griffith) 450 tonne
  • Pine Street (Griffith) 450 tonne

Tender Document

Contact:
Jamie Doering, Public Works Manager
Phone: 613-752-2222 ext.2019
[email protected]